Port of Astoria Waterfront District
Stormwater System Improvements
Camp Rilea Armed Forces Training Center Structural Collapse Venue

Owner: Port of Astoria

Location: Astoria, OR

Project Size: $2,000,000

Project Category:  Civil


Description:  CCC installed a storm water system including HDPE Pipe, 2 pump stations, 40,000 yards of excavation and embankment, seeding and planting. 

Fairgrounds Skate Park


Portfolio: Civile.

Links:



Owner: City of Battle Ground, WA

Location: Battleground, WA

Project Size: $3,000,000

Project Category: Civil


Description: Skate Park, Site work, Buildings and Roadwork.


Owner: C-Tran

Location: Vancouver, WA

Project Size: $150,000

Project Category: Civil


Description:

C-Tran contracted with Conway Construction to install a pull out bus stop to reduce congestion on a busy arterial in Vancouver, WA. CCC partnered with local contractors Cemex Construction Group, Mill Plain Electric and others to bring the project in on time and under budget.

C-Tran Super Stops
Andresen Road Southbound

Links:




Owner: Pierce County

Location: Tacoma, OR

Project Size: $1,700,000

Project Category:  Civil


Description: Conway Construction Company constructed intersection improvements including 2,000 ft of storm sewer, structural shoring, a 20X80 precast storm sewer detention vault, signals, road base, curb, gutter, sidewalk and paving

A St South and 112th Street East

1.360.887.3022

Links:




0.8 Miles West of Chapman Road
Erosion Protection

Owner: US Army Corp of Engineers

Location: Orting, Wa

Project Size: $400,000

Project Category:  Civil, Excavation, Bank Armouring


Description: The USACE called on a Thursday to announce its award of this contract to Conway Construction Company. Conway Construction Company was on the ground working by Saturday of the same week. CCC provided four 86,000lb-95,000lb excavators, five dump trucks, a water truck and grader to perform the work.

Links:




Links:




Owner: Oregon Military Department

Location: Warrenton, OR

Project Size: $500,000

Project Category:  Civil, Unique


Description: Conway Construction Company completed the Structural Collapse Venue within 45 calender days. CCC performed extensive analysis and CAD drawings in order to assure the structure fit as designed. CCC was able to beat the schedule for this demanding process and earned the accolades of the Oregon Military for a job well done.

Owner: WSDOT

Location: Randle, Wa

Project Size: $1,600,000

Project Category:  Civil, Excavation, Bank Armouring


Description: Conway Construction Company successfully completed the addition of over 17,000 tons of rip rap to  the 1,900 feet to the bank of the Cowlitz River. The project was completed  well ahead of schedule, on budget and complied with all the environmental regulations of the many local, state and federal permits.

Owner: Federal Highway Administration

Location: Megler, OR

Project Size: $1,000,000

Project Category:  Civil


Description: CCC rehabilitated the Dismal Nitch Rest area with new curbs, sidewalk, paving, interpretive signs, pedestrian railing, decorative curved concrete walls with painted faux stone, topsoil and plantings. CCC accomplished the work under a tight schedule during one of the wettest falls in memory. 


CCC received commendations from the Federal Highway Administration for their work on the project. 

Links:




Links:




South River Road Slope Mitigation

Links:




Owner: City of Salem

Location: Salem, OR

Project Size: $280,000

Project Category:  Civil, Slope Stabilization


Description: CCC and its sub-contractor scaled over 800 tons of rock from this unstable slope it Salem Oregon. CCC completed the work in the tight 3 week time period to minimize impacts to the traveling public.

USACE Pierce County Emergency Revetment Repair

Owner: City of Vancouver

Location: Vancouver, WA

Project Size: $1,200,000

Project Category:  Excavation, Drainage, Roadwork, Sidewalks and Paving


Description: CCC installed 1/2 mile of new road including storm, sewer in sidewalk. CCC completed 1/2 street improvements at another location. CCC completed the work on time.

414 Pioneer StreetRidgefieldWA 98642, USA
Dismal Nitch and Megler Rest Area
Ocrhards TIF Area Projects: NE 45th and NE 82nd